Every link of the chain in flow order, its capacity stacked per source. The lowest capacity is the capacity of the whole system (IPSC, Integrated Production System Capacity), set by the bottleneck. The dashed outlines are the planned capacities, the narrow bars the throughput now; the arrows on the right measure the gaps between the lines. Made-up data. Click a part for details.
A simpler chain with [label, value] data, a level line for the potential and one for the
actual production, and another use of the export pumps (other) that does not count as
capacity.